Tenancy and Manufactured Homes (19:XVI): Difference between revisions
Jump to navigation
Jump to search
Desy Wahyuni (talk | contribs) m (→A. General) |
Desy Wahyuni (talk | contribs) |
||
Line 143: | Line 143: | ||
====c) Material Term Breach==== | ====c) Material Term Breach==== | ||
If the landlord breaches a material term, the tenant may end the tenancy by giving the landlord notice to end the tenancy effective on a date that is after the date the landlord receives the notice. See Section IX.C Required Notice at 1, Form and Basic Requirements | If the landlord breaches a material term, the tenant may end the tenancy by giving the landlord notice to end the tenancy effective on a date that is after the date the landlord receives the notice. See Section IX.C Required Notice at 1, Form and Basic Requirements. | ||
===2. Failure to Pay Rent=== | ===2. Failure to Pay Rent=== |